Synchronizing Systems

  • Automatic voltage, frequency and phase synchronization
  • Proportional kW and kVAR load sharing
  • Generator start and stop according to load demand
  • Load shedding based on configured priorities
  • Generator protection and controlled breaker operation
  • HMI display of operating status and electrical measurements
  • Optional Modbus communication and remote monitoring
  • Provision for future generators when included in the design
Product Details

ENERZIP Generator Synchronizing and Paralleling Systems

ENERZIP supplies synchronizing and paralleling control systems for diesel and gas generator power plants. The systems allow multiple generator sets to operate on a common electrical bus, with automatic synchronization, active and reactive load sharing, generator sequencing and circuit breaker control.The ENERZIP EZ-PGC system range supports multi-generator configurations of up to 99 generator sets. The control architecture, communication network, busbar arrangement and protection system are designed for the number and capacity of generators in each installation.These systems are used in industrial power plants, mining operations, remote facilities, pumping stations and standby power installations where more than one generator is required.ENERZIP provides synchronizing controllers, generator breaker control, power distribution equipment, protection interfaces and HMI monitoring as part of the system configuration.

What a Synchronizing System Does

When a generator is connected to an energized busbar, its voltage, frequency, phase sequence and phase angle must be compatible with the existing supply.

The synchronizing controller measures the generator and busbar conditions, adjusts the generator speed and voltage through the available governor and AVR interfaces, and permits breaker closing when the configured synchronizing limits are satisfied.

Once connected, the generators share the electrical load according to their assigned ratings and control settings.

The system can also bring additional generators online as demand increases and remove units when the load decreases.

Generator Starting and Synchronization Sequence

The starting sequence depends on whether the busbar is energized and how many generators are available.

First Generator — Dead Bus Operation

When the busbar has no voltage, the first available generator starts and establishes the required output voltage and frequency.

The control system checks the dead-bus conditions and the applicable breaker interlocks before permitting the first generator breaker to close.

This generator establishes the electrical reference for the next generator entering the system.

Additional Generators — Live Bus Synchronization

Each incoming generator starts independently and reaches its operating voltage and frequency.

Its controller compares the incoming generator with the energized busbar. The control system adjusts speed and excitation until the configured synchronization conditions are met.

The generator circuit breaker then closes, and the unit begins accepting its assigned share of the load.

Normal Generator Shutdown

During a controlled shutdown, the system transfers the departing generator’s load to the remaining available units.

After unloading, the generator breaker opens and the engine completes its programmed cooling and stopping sequence.

A protection trip follows the relevant fault response rather than the normal unloading procedure.

kW and kVAr Load Sharing

A synchronizing system must control both active power and reactive power. These are separate functions and require correct engine governor and alternator excitation settings.

Active Power Sharing (kW)

Active power sharing is controlled through engine speed and governor load-control functions. The controllers distribute the total kW demand among the connected generators.

For generators with unequal ratings, proportional load sharing assigns power according to each unit’s configured capacity.

For example, when generators of different rated powers operate together, they do not need to carry identical kW loads. Their load contribution is controlled against their respective rated capacities.

Reactive Power Sharing (kVAr)

Reactive power sharing is controlled through the alternator excitation system.

The synchronizing controllers work with the AVR interfaces to distribute reactive load and maintain the required busbar voltage.

Correct CT polarity, voltage sensing connections, AVR settings and controller configuration are essential for stable kVAr sharing.

Different Generator Brands and Capacities

Generator sets with different engine or alternator brands can be integrated into the same paralleling system when their electrical ratings, frequency, control interfaces and operating characteristics are compatible.

Before integrating an existing generator, ENERZIP reviews the engine governor, alternator AVR, controller, circuit breaker, sensing circuits and available control signals.

Generators connected to the same AC bus must operate at compatible system voltage and frequency. Different engine brands alone do not prevent paralleling.

Automatic Generator Power Management

The power management system monitors the connected load and the available generating capacity. Generator start and stop commands are issued according to the configured load thresholds, delays and operating priorities.

Automatic Generator Addition

When the operating generators approach the configured load threshold, an available standby generator is started.

After the generator reaches the required operating conditions, it synchronizes with the busbar, closes its breaker and begins sharing the load.

The starting threshold and delay are selected to avoid unnecessary starts during brief load fluctuations.

Automatic Generator Removal

When the load falls below the configured stopping threshold, the system can unload and disconnect a generator while the remaining units continue supplying the bus.

The generator then follows its cooling and stopping sequence.

Running Hours and Unit Priority

Compatible control systems can rotate generator starting priority according to running hours or a defined operating schedule.

Operators can also designate unavailable units for maintenance and exclude them from automatic starting.

Load Shedding

If generating capacity becomes insufficient, the power management system can disconnect specified non-essential loads according to the approved priority schedule.

Load shedding requires the corresponding outgoing circuit breakers or contactors and their control interfaces.

If a generator trips, continued power supply depends on the remaining generation capacity and the amount of connected load. The system cannot maintain all loads when the available capacity is insufficient.

System Equipment and Technical Configuration

Synchronizing systems are supplied as project-specific electrical assemblies. The following information describes the main equipment and how it is selected.

Equipment ENERZIP System Configuration Selection Basis
Synchronizing Controllers DSE, ComAp or SmartGen platforms suitable for the selected control architecture Number of generators, governor and AVR interfaces, operating functions and communication requirements
Generator Circuit Breakers Electrically operated breakers with closing, opening and status-feedback circuits Generator rated current, system voltage, short-circuit level and protection design
Common Busbar Copper busbar system and associated power connections Combined operating current, short-circuit withstand requirements and feeder layout
Protection Equipment Generator and system protection relays or controller-based protection functions Electrical single-line diagram and approved protection coordination
HMI and Monitoring Generator status, busbar measurements, circuit breaker position, load values and alarms Selected controller, HMI and signal list
Communication Supported controller communication interfaces, including Modbus where specified PLC, SCADA, remote monitoring and control network requirements
Power Distribution Panel Incoming generator circuits, busbar connections and specified outgoing feeders Installation layout, power cable sizes and outgoing load arrangement

Synchronizing Controllers

ENERZIP works with synchronizing and load-sharing controllers from DSE, ComAp and SmartGen.

Controller selection is based on the actual system configuration. For large generator plants, the overall control architecture must account for the number of connected units, communication requirements and power management arrangement.

The maximum 99-generator system capacity refers to the engineered ENERZIP system architecture, not the individual connection limit of every controller model.

Power and Control Connections

The control panel includes the required interfaces for generator voltage and current measurement, governor control, AVR control, breaker operation and equipment status.

The final circuit breaker arrangement, busbar rating, protection settings and cable connection layout are established from the approved electrical design.

Operating Modes

ENERZIP systems can be configured for generator-to-generator paralleling or approved utility-grid parallel operation. These applications use different control and protection arrangements.

Mode Operation Application
Island Mode Generators operate together on a common bus without connection to the utility grid. Remote power plants, mines, industrial sites and off-grid pumping stations.
Standby Multi-Generator Multiple generators start and connect to a designated standby bus after normal power is lost. Industrial and commercial standby power systems.
Load Demand Control Generators are added or removed according to configured load thresholds. Facilities with changing electrical demand.
Grid-Parallel Generator output is synchronized with the utility supply through a dedicated mains control and protection arrangement. Approved grid-connected generator plants.
Base Load / Peak Shaving Generator output or grid import is controlled to specified operating targets. Industrial grid-parallel applications where the operating arrangement is authorized.

Generator-to-Grid Synchronization

A generator-to-generator paralleling system is not automatically suitable for parallel operation with a utility grid.

Grid-connected projects require the appropriate mains controller, synchronization checks, protection relays, circuit breaker arrangement and utility interface.

Protection against unintended islanding, export control and closed-transition functions are included where required by the approved project design and local grid rules.

Where the system is designed only for isolated generator operation, it does not permit intentional parallel connection with the public grid.

Electrical Protection and Operating Safety

Generator protection and breaker interlocking are included in the control design to protect the generating equipment and distribution system.

The applicable protection scheme can include:

  • Synchronism-check protection before breaker closing
  • Generator overvoltage and undervoltage protection
  • Overfrequency and underfrequency protection
  • Overcurrent and overload protection
  • Reverse power protection
  • Breaker failure and position discrepancy monitoring
  • Emergency shutdown and generator fault isolation
  • Earth fault protection where specified

Protection settings are selected according to the generator characteristics, circuit breaker ratings, fault levels and coordination requirements.

Synchronization blocking prevents a generator breaker from closing onto an energized bus when the electrical conditions are outside the permitted synchronization limits.

The required protection functions, measurement inputs and breaker trip circuits are identified in the electrical drawings and controller configuration.

Factory Testing and Site Commissioning

Factory testing verifies the assembled panel and its programmed control functions. Site commissioning checks the complete system with the installed generators, breakers, cabling and electrical loads.

These are separate stages of the project and have different test requirements.

Factory Acceptance Testing (FAT)

The FAT procedure covers the supplied panel against its approved technical specification.

  • Check installed controllers, breakers and protection equipment against the approved equipment list.
  • Inspect busbars, power connections, protective earthing and control wiring.
  • Verify controller power supplies, measurement circuits and input/output wiring.
  • Check generator starting commands and breaker operating circuits.
  • Test breaker status signals, alarms and interlocking logic.
  • Check the programmed operating sequence through the agreed simulation or test arrangement.
  • Record the inspection and functional test results.

A simulated FAT verifies panel functions but does not replace actual generator synchronization and load-sharing tests at the site.

Site Acceptance Testing and Commissioning (SAT)

Site commissioning begins after installation of the generator sets, power cables, control cables and synchronizing equipment.

Step 1 — Electrical Inspection

Check the power and control connections, phase sequence, protective earthing, insulation test results, CT ratios and polarity, voltage sensing and breaker feedback circuits.

Step 2 — Individual Generator Operation

Start and test each generator separately. Check engine speed, voltage regulation, frequency control, protection signals and breaker operation before parallel testing.

Step 3 — Synchronization

Start an incoming generator and check synchronization against the energized busbar. Verify voltage, frequency and phase-angle matching, synchronization permission and breaker closing feedback.

Step 4 — kW and kVAr Sharing

Operate the generators in parallel and check active and reactive load distribution. Adjust governor and AVR-related settings as required for stable operation within the approved operating range.

Step 5 — Automatic Power Management

Check load-demand starting and stopping, generator unloading, breaker opening and the configured operating priorities.

Step 6 — Protection and Fault Response

Check the agreed alarms, breaker trips, synchronization blocking and load shedding outputs through approved test methods.

Step 7 — Final Settings and Handover

Record the agreed synchronizing limits, load-sharing settings, generator priorities, start/stop thresholds, protection settings and relevant commissioning results.

Commissioning acceptance: The actual test loads, test instruments, operating limits and acceptance criteria are defined in the project commissioning procedure. The system is accepted against those agreed requirements, not against a general statement that all parallel systems must achieve the same results.

International and Chinese Electrical Standards

ENERZIP low-voltage synchronizing and paralleling switchgear assemblies are designed and manufactured in accordance with the applicable requirements of international IEC standards and Chinese GB/T standards.

Low-Voltage Switchgear and Controlgear Assemblies

  • IEC 61439-1:2020 — Low-voltage switchgear and controlgear assemblies — Part 1: General rules.
  • IEC 61439-2:2020 — Low-voltage switchgear and controlgear assemblies — Part 2: Power switchgear and controlgear assemblies.
  • GB/T 7251.1-2023 — Low-voltage switchgear and controlgear assemblies — Part 1: General rules.
  • GB/T 7251.2-2023 — Low-voltage switchgear and controlgear assemblies — Part 2: Power switchgear and controlgear assemblies.

Circuit Breaker Standards

  • IEC 60947-2:2024 — Low-voltage switchgear and controlgear — Part 2: Circuit-breakers.
  • GB/T 14048.2-2020 — Low-voltage switchgear and controlgear — Part 2: Circuit-breakers.

The assembly standards apply to the relevant low-voltage power switchgear and controlgear construction. The circuit breaker standards apply to the corresponding breaker equipment.

The electrical design and verification cover the applicable rated electrical characteristics, insulation, protective circuits, temperature-rise requirements, short-circuit characteristics and assembly construction.

Grid-parallel projects also follow the applicable local utility interconnection and protection requirements.

Applications of Generator Paralleling Systems

Industrial Power Plants

Factories and processing plants use multiple generators when the total electrical load, operating schedule or standby requirements call for more than one generating unit.

The system coordinates the incoming generators and distributes load between the units operating on the common bus.

Mining and Remote Power Supply

Mining sites and remote facilities can operate multiple generator sets without a utility grid connection.

Automatic generator sequencing allows the available generation capacity to be adjusted as electrical demand changes.

Standby Generator Plants

Multi-generator standby systems supply a designated emergency or standby bus. The number of running generators is selected according to the load and the required system operating arrangement.

Where an N+1 redundancy arrangement is required, the remaining available units must have sufficient capacity to carry the specified load following the loss of one generator.

Water Supply and Pumping Stations

Large pumping installations may require several generators to supply pump motors and auxiliary equipment.

Motor starting methods, starting sequence, operating current and load steps are considered when selecting generator capacity and configuring the power management system.

Gas Generator Power Plants

The system can be configured for parallel operation of compatible gas generator sets, including natural gas and biogas generator applications.

The control arrangement takes account of the engine governor response, available electrical output and generator operating limits.

Information Required for System Design and Quotation

To prepare an accurate synchronizing panel configuration, ENERZIP needs the electrical details of the generator plant and its connected loads.

Required Information Why It Is Needed
Number of generators and rated power (kW / kVA) Determine controller quantity, generator breaker ratings and available plant capacity.
System voltage, frequency and power factor Establish electrical ratings and measurement configuration.
Engine brand, model and governor type Check engine speed and active load-sharing interfaces.
Alternator brand, model and AVR type Check voltage control and reactive load-sharing interfaces.
Existing generator controller models Determine compatibility and required controller replacement or integration.
Electrical single-line diagram Define generator incomers, busbars, breakers and outgoing feeders.
Maximum demand and major motor loads Check generator capacity, load steps and automatic starting requirements.
Island or grid-parallel operation Establish the required mains interface and protection arrangement.
Prospective short-circuit current Determine switchgear and breaker short-circuit ratings.
Load priorities and redundancy requirements Configure generator sequencing, available reserve and load shedding.
Monitoring and communication requirements Define HMI, Modbus, PLC or SCADA interfaces.
Future generator expansion Identify provisions needed in the controller architecture, busbar and panel design.
Project location and installation conditions Check enclosure requirements and site operating conditions.

For an existing generator plant, equipment nameplate photographs, controller model numbers, governor and AVR information, and the current single-line diagram are particularly useful.

ENERZIP prepares the synchronizing panel specification, control architecture, circuit breaker arrangement and electrical drawings from the project data.

The technical proposal identifies the equipment included in the supply and the agreed scope of FAT, installation, commissioning and operator training.

ENERZIP AFRICA POWER SOLUTIONS provides equipment supply and project technical coordination for Malawi, Mozambique, Tanzania, Zambia and Zimbabwe.

FAQS

You can request a quote for diesel, natural gas or biogas generator sets, diesel-driven water pumps, ATS and control panels, or generator synchronizing systems. You can also use the form for installation, commissioning, maintenance or spare parts.

Send the project location, what you need, the quantity if known, and your required date. For a generator, include the required kW or kVA, voltage, frequency and whether it will run as standby or primary power. For a pump, include the required flow and total head. For an ATS or synchronizing system, share the equipment ratings and a single-line diagram if available.

Yes. Send your load list, pump duty point or details of the equipment already on site. We can review the requirements with you and identify a configuration for your application. If you have a tender specification or an existing equipment datasheet, send it with your inquiry.

The quotation identifies the proposed equipment or service, the main specifications, the price and the estimated lead time. If you need delivery, factory testing, on-site work, operator training or an initial spare-parts package, tell us so we can address those items in the quotation.

Yes. We can arrange installation and commissioning support according to the project location and agreed scope. Send the equipment model, site details and the work you need. The quotation can then specify who is responsible for site preparation, connections, start-up, testing and operator training.

Send the equipment model and serial number, the part number if known, and clear photos of the nameplate and part. For a fault or service request, include the site location, operating hours, alarm codes and a short description of what happened. This helps us identify the correct part or assess the work required.

The quotation or contract states the warranty period, its start date, any operating-hour limit and the coverage for the equipment supplied. If your tender specifies a warranty period or service arrangement, include those requirements with your inquiry.

Our team in Zomba, Malawi, serves customers in Malawi, Mozambique, Tanzania, Zambia and Zimbabwe. Delivery and on-site service arrangements depend on the project location and the work requested.

Request a Quote or Service

Tell us what equipment, spare parts or site service you need. Our team will review your requirements and contact you to discuss the scope and prepare a quotation.

Request Your Free Quote Anytime

Packmate’s team is online 24 hours a day to answer your questions. Reach out immediately to find the perfect packaging machine for your business.

Contact Us Now

Our specialists will get back to you within 10 minutes.