Generator, Pump & Power Systems FAQ

Equipment Selection

What equipment does ENERZIP Africa supply?

We supply diesel, natural gas and biogas generator sets, diesel-driven water pumps, automatic transfer switches (ATS), control panels and generator synchronizing systems. Customers can request equipment supply on its own or include commissioning, training or spare parts in the quotation. View our power equipment and services

How do I size a generator for my site?

Send a list of the equipment that will run at the same time. Include running loads, voltage, phase, frequency and expected operating hours. For pumps, compressors or lifts, include the starting method and which loads will already be running when they start. Also provide the site altitude and maximum ambient temperature so we can check the output available at the installation. Diesel generator sets

What do PRP, COP and ESP mean on a generator datasheet?

PRP (Prime Power) is a rating for variable-load operation under the manufacturer’s stated limits. COP (Continuous Power) applies to operation at a specified constant load under the stated conditions. ESP (Emergency Standby Power) is for emergency operation during a failure of the normal supply, within the stated load and operating-hour limits. Tell us how often the set will run and what it must carry. We can then identify the applicable rating on the quotation.

What fuel information do you need for a natural gas or biogas generator?

For natural gas, send the gas supplier’s specification or a recent analysis, the lower heating value, the available gas flow and the pressure at the proposed generator inlet under load. For biogas, also include the methane range, hydrogen sulfide (H₂S), and moisture or dew point. Provide measurements taken after gas treatment where available. These details help us review the engine selection, gas treatment and fuel supply requirements. Natural gas generator sets · Biogas generator sets

What information do you need to select a diesel-driven water pump?

Start with the required flow in m³/h and total dynamic head in metres at the same operating point. If you have yet to calculate the head, send the suction and discharge elevations, pipe diameters, approximate pipe lengths and required discharge pressure. Tell us what the liquid contains and whether the pump must lift water on the suction side. Diesel water pumps

When do I need an ATS or a synchronizing panel?

An ATS transfers the load between the normal power source and a standby source. A synchronizing panel matches the voltage, frequency and phase of a generator to the bus before connecting it in parallel. When generators operate together, the controls also manage load sharing. Send the site single-line diagram, source ratings and required operating sequence so we can review the control and protection requirements. ATS and control panels · Generator synchronizing systems

Quotations and Orders

What should I send when requesting a quotation?

Include the project country and city, the equipment or service you need, the quantity if known, and the required delivery or service date. Add technical specifications, a load list, a site drawing or equipment nameplate photos where relevant. You can start with the information you have, and our team can identify what else is needed for selection. Request a quotation

Can you prepare a quotation against a tender specification?

Send the technical specification, equipment schedule, required delivery location and submission deadline. Include any required drawings, certificates, factory tests or site acceptance tests. The quotation can identify the proposed configuration, any deviations from the specification, and the documents and services included in the offer.

What affects the price and delivery time?

Price and lead time depend on the equipment configuration, quantity, delivery destination and agreed scope. For a generator, the engine, alternator, enclosure and control panel can affect both. If the project requires installation, testing, training or a spare-parts package, identify those requirements so the quotation can state what is included and the estimated schedule.

What technical documents can I request with an order?

Tell us which documents your project requires, such as a technical datasheet, general arrangement drawing, electrical diagram, operation and maintenance manuals or a factory test report. For a tender or regulated installation, send the exact certificate or conformity document required. We will confirm what is available for the quoted equipment configuration.

Installation and Commissioning

Can ENERZIP Africa arrange installation and commissioning?

Yes. We can coordinate installation and commissioning according to the project location, equipment and agreed scope. Send the site address, equipment model, drawings and the work you require. The quotation can specify who provides site preparation, connections, start-up, functional testing and handover. Installation and commissioning services

What should be ready before the commissioning visit?

Agree on the site-readiness list before the visit. For a generator project, this can include the foundation, equipment access, ventilation, exhaust, fuel supply, cables and earthing. For a pump project, it can include the suction and discharge connections and water available for testing. The list should identify who completes each item and who provides the test load or operating conditions.

Can I request factory testing, site testing or operator training?

Yes. State the test and training requirements when you request a quotation. Where included, the agreed test plan sets out the equipment to be tested, load points, acceptance criteria and records to be provided. Operator training can cover start-up, shutdown, routine checks and alarms for the supplied equipment. Testing and commissioning support

Maintenance, Warranty and Spare Parts

Can you help with equipment that is already on site?

Send the equipment make, model, serial number, site location and operating hours. For a fault, include the alarm code, relevant photos and what the machine was doing when the fault occurred. We can review the information and confirm the service that can be provided for that equipment and location. After-sales support

How do I request the correct spare part?

Send the equipment model and serial number, the part number if known, and clear photos of the nameplate and part. For generator parts, include the engine, alternator or controller model and serial number for the component concerned where available. Tell us the quantity and delivery location so we can confirm the part, price and availability. Generator spare parts

What warranty applies to the quoted equipment?

Check the quotation or contract for the warranty period, start date, any operating-hour limit and what is covered. Keep the equipment serial numbers, commissioning record and service history. If your tender sets a particular warranty term or requires on-site support, include it when you request a quote so it can be addressed in the offer.